Go to Carrier Operations → Load Management → Dispatch.
To confirm a driver, open an asset assignment by clicking on the button.
After a load has been dispatched, the driver confirmation toggle will show next to the badge. This setting is used to track if the driver has confirmed the load. Click to toggle it to the on position to mark it as confirmed.
If Load Planning is enabled, then a badge will be displayed on the load in the Load Planning tab.
For more information about Load Planning, refer to this article.
Comments
0 comments
Please sign in to leave a comment.