To assign resources to a load, go to Load Management → Loads → Active Loads → Load Events. Click the to open Resource Assignment.
To edit the resource assignment, click the icon.
Enter in the desired resource information and click Assign to complete the assignment. The information will be displayed in the load details in the Active Loads form.
To add tracking to the load, click the icon. For more information on load tracking, refer to this article.
Comments
0 comments
Please sign in to leave a comment.